Project Detail

List of EPC Projects For Independent Power Producers

S. No Type of Line Description of Projects Volume of Work Scope of Work
1 110kV Single Circuit Line* Sri Venkatramana Paper Mills Private Limited Gas Plant to Kodavasal 110kV S/S for Power Evacuation to their 6 MW Gas Based Power Plant, Tamil Nadu, India 11.19 KM Total Turnkey (EPC) OHTL Construction (Survey, Manufacturing & Supply, Foundation, Erection and Stringing Works) for M/s. Sri Venkatramana Paper Mills Private Limited
2 230kV Single Circuit Line on Double Circuit Towers* M/s KVK Energy and Infrastructure Private Limited to Thiruvarur 230kV S/S for Power Evacuation to their 150 MW Coal Based Power Plant, Tamil Nadu, India. 25 KM Total Turnkey (EPC) OHTL Construction (Survey, Supply, Foundation, Erection and Stringing Works) for M/s. KVK Nagai Power Private Limited
3 110kV Single Circuit Line on Double Circuit Towers Tulsyan Nec Limited to 110kV Gummidipondi S/S for Power Evacuation to their 70 MW Coal Based Power Plant,Tamil Nadu, India/td> 7.9 KM Project Management Services for OHTL Construction for (M/s.Tulsyan Nec Limited) during 2012-2013 and Foundation,Erection and Stringing of Monopoles.
4 230kV Double Circuit Line Suryadev Alloys and Power Private Limited, Gummidipondi for Power Evacuation to their 160 MW Coal Based Power Plant, Tamil Nadu, India/td> 5 KM Total Turnkey (EPC) OHTL Construction (Survey, Supply, Foundation, Erection and Stringing Works) for M/s. Suryadev Alloys and Power Private Limited during 2012
5 230kV Double Circuit Line M/s.Cauvery Power Generation Private Limited, Billakuppam Village – Gummidipoondi TNEB Substation for Power Evacuation to their 60 MW Coal Based Power Plant, Tamil Nadu, India 5 Km Total Turnkey (EPC) OHTL Construction (Survey, Supply, Foundation, Erection and Stringing Works) for M/s.Cauvery Power Generation Pvt Ltd during 2010-2011.

List of Pojects for State and Central Government Utilities

S. No Type of Line Description of Projects Volume of Work Scope of Work
1 110kV Single Circuit Line on DC Towers* 110kV Single Circuit Neyveli-Panruti Radial Line, Tamil Nadu, India 20.92 KM Manufacturing & Supply, Foundation, Erection and Stringing Works for TANTRANSCO, Trichy
2 110 KV Double Circuit Line* 110 KV LILO of Nagudi – Peravurani 110 KV S/C Line at Propose 110 KV Keeramangalam S/S 6.90 KM Manufacturing & Supply, Foundation, Erection and Stringing Works for TANTRANSCO, Trichy
3 230kV Multi Circuit Line* NCTPS – TVLM feeder I & II and NCTPS – Sriperumbudur, Gummidipoondi feeder at Neithavoyal Village, Tamil Nadu, India 2.5 KM Manufacturing & Supply, Foundation, Erection Works for M/s. Standard Grease Ltd / TANTRANSCO, Chennai
4 110kV Single Circuit Line on DC Towers Neyveli- Aduthurai 110 KV SC Line at Pappakudi 110kV SS, Tamil Nadu, India 12.05 KM Manufacturing & Supply, Erection and Stringing Works for TANTRANSCO, Trichy
5 110kV Single Circuit Line LILO of Kallakudi – Thuraiyur 110KV SC line, Tamil Nadu, India 2.3 KM Supply, Foundation, Erection and Stringing Works for TANTRANSCO, Trichy during 2012
6 110kV Double Circuit Line LILO of 110 KV Palladam- Ingur feeder at Proposed 110/11 KV SS at Alagumalai, Tamil Nadu, India 2.5 KM Supply, Erection and Stringing Works for TANTRANSCO, Coimbatore during 2012
7 110kV Double Circuit Line Dhandapani Cements to Samayapuram SS, Tamil Nadu, India 7 KM Total Turnkey (EPC,EHV) OHTL Construction (Survey, Supply, Foundation, Erection and Stringing Works) for TANTRANSCO, Trichy during 2012
8 400kV Multi Circuit Line Sunguvarchatram – Alamathy, Chennai, Tamil Nadu, India 18 KM / 4500 MT Foundation, Tower Erection and Stringing Works for JSL/Tamil Nadu Electricity Board during 2010-2011
9 220 KV Double Circuit Line Mysore – Kushalnagar,Karnataka,India 85 KM Survey,Foundation,Erection and Stringing works for KPTL during 2007 – 2009
10 110 KV Double Circuit Line Kondenellu – Gerumar,Karnataka,India 25 KM Survey,Foundation,Erection and Stringing works for KPTL during 2007
11 400 KV Double Circuit Line Dhar,Madyapradesh,India 105 KM Stringing work during 2007
12 110 KV Feeder Line TamilNadu Chemicals for Power evacations to TNEB Substation,India 3.2 KM Total Turnkey during 2007
13 230 KV Double Circuit Line Valathur – Karaikudi(2nd reach),TamilNadu,India 21 KM Survey,Foundation,Erection and Stringing works for M/s ICOM LTD 2007
14 230 KV Double Circuit Line Valathur – Karaikudi(1st reach),TamilNadu,India 21 KM Survey,Foundation,Erection and Stringing works for M/s BAJAJ ELECTRICALS LTD during 2007
15 400 KV Double Circuit Line Neyveli – Pugalur,TamilNadu,India 50 KM Foundation works for PGCIL,India during 2006 – 2007
16 230 KV Double Circuit Line Hubli Karnataka 71 KM Erection and Stringing works for M/s Larson & Turbo Limited during 2004 – 2005
17 400 KV Single Circuit Line Gooty – Hooty Karnataka 100 Towers Maintenance work under shutdown condition Insulator changing for Power Grid Corporation of India Limited,Southern Region II during 2004 – 2005
18 400 KV Single Circuit Line Bangalore – Nelamangala Line ,Karnataka Railway Crossing work Survey,Foundation,Erection and Stringing works of Railway crossing for M/s Power Grid Corporation of India Limited,Southern Region II during 2004 – 2005
19 400 KV Single Circuit Line Hydrabad – Kurnool Gooty for Power Grid Corporation of India 170 KM Foundation,Erection and Stringing works of Twin Moose Conductor for M/s SPIC SMO during 2004 – 2005
20 400 KV Double Circuit Line Kolar – Hosur for Power Grid Corporation of India 53.5 KM Stringing of Twin Moose Conductor for M/s Hyundai Engineering Co.Ltd.,Korea during 2002 – 2003
21 400 KV Double Circuit Line Kolar – Hosur for Power Grid Corporation of India 80 KM Foundation,Erection and Stringing works of Quad-Bersimis Conductor for M/s Hyundai Engineering Co. Ltd.,Korea during 2002 – 2003
22 400 KV Single Circuit Line Kolar – Arakkonam for Power Grid Corporation of India 104 KM Tower Erection and Stringing works of Twin Moose Conductor for M/s SPIC SMO during 1999 – 2000
23 100 KV Double Circuit Line Saint Gobain Factory – SIPCOT,TamilNadu, India 8 KM Tower Erection and Stringing works of Panther Conductor for TNEB during 1999 – 2000
24 230 KV Double Circuit Line Singaperumal Kovil – Tharamani,TanilNadu,India 37 KM Tower Erection and Stringing works of Zebra Conductor for TNEB during 1998 – 1999
25 230 KV Double Circuit Line Trichy – Karaikudi,TamilNadu,India 20 KM Tower Erection and Stringing works of Zebra Conductor for TNEB during 1997 – 1998
26 230 KV Double Circuit Line Sriperumpudur – Koyambedu,TamilNadu,India 80 Km Foundation,Erection and Stringing work for TNEB,during 1995
27 230 KV Double Circuit Line Thiruvalam – North Madras Thermal Power Project 70 KM Foundation,Erection and Stringing work for TNEB,during 1994
28 230 KV Double Circuit Line Sriperumpudur – North Madras Thermal Power Project 80 KM Foundation,Erection and Stringing work for TNEB,during 1992
29 230 KV Double Circuit Line Sriperumpudur – Koyambedu,TamilNadu,India 40 KM Foundation,Erection and Stringing work for TNEB,during 1990
30 230 KV Double Circuit Line Hosur – Thiruvalam,TamilNadu,India 82 KM Foundation,Erection and Stringing work for TNEB,during 1989
31 110 KV Single Circuit Line Sriperumpudur – Kadaperi,TamilNadu,India 40 KM Foundation,Erection and Stringing work for TNEB,during 1989
32 230 KV Double Circuit Line Sriperumpudur – Kadaperi,TamilNadu,India 40 KM Foundation,Erection and Stringing work for TNEB,during 1985
33 400 KV Single Circuit Line Neyveli – Salem,TamilNadu,India 100 KM Foundation,Erection and Stringing work for Best & Cromptom Ltd., during1981

*Project in Progress