Assembled and erected 7, 500 tons of steel material between CEEG and ELECNOR, located in Algeria
Performed complete Line stringing for single circuit duplex AAAC570 conductor plus one OPGW plus one galvanized steel earth cable
CLIENT:ELECNOR Infrastructures DATE: 01.05.2011 WORK COMPLETED:
Assembled and erected 3, 500 tons of steel material between CEEG and ELECNOR, located in Algeria
Performed complete Line stringing for AAAC conductors plus OPGW cables
CLIENT:ETDE CONGO PROJET THT DATE: 01.11.2011 WORK COMPLETED: Assembly and erection of towers, Stringing of conductors and reconstruction of 220kV Transmission Overhead Lines from Mindouli to Tsielampo in Republic of Congo.
CLIENT:AMEC Power Limited DATE: 15.09.1996 WORK COMPLETED: Successful erection of 106 D.C. 132kV Towers and Stringing 85 kms of Twin 'AAAC' conductors with associated accessories.
CLIENT:CTC Global Corporation DATE: 01.08.2015 WORK COMPLETED: Successful patended manufacturers of ACCC*(Hybrid carbon and glass fiber composite core).
CLIENT: Jyoti Structures Limited DATE: 08.01.2002 WORK COMPLETED: Successful erection and stringing of conductors with OPGW earth wire between Mudaibi to Mudairib in Oman
CLIENT: LG TEK DATE: 11.07.2002 WORK COMPLETED: Successful stringing and erection of 220kV transmission line from Kotugoda to Veyangoda.